Change order of accounts in Outlook for Mac

Joined
Mar 23, 2013
Messages
201
Reaction score
11
Points
18
Location
near Versailles
Your Mac's Specs
2021iMac M1Ventura;2019 iMac 21.5 Ventura;2017MB 12"Mojave, 2iPhone12, AW2 + AW6
Hello all,

I have been using Outlook (Classic) for Mac on my iMac (Sonoma 14.4.1) for years, but never resolved this issue : it doesn't let me change the order of email accounts in the left-hand list.
A Google search turned up some solutions that just did not work - the accounts do not move with the mouse.

I suspect that either 1) there is not a solution or 2) there is a simple solution that I just haven't found yet.

Thanks in advance

Ann

PS also using Outlook on my iPad but I'll deal with that later.
 

IWT


Joined
Jan 23, 2009
Messages
10,703
Reaction score
2,602
Points
113
Location
Born Scotland. Worked all over UK. Live in Wales
Your Mac's Specs
M2 Max Studio Extra, 32GB memory, 4TB, Sequoia 15.4.1 Apple 5K Retina Studio Monitor
Joined
Dec 30, 2022
Messages
935
Reaction score
538
Points
93
Location
Somerset, England
Your Mac's Specs
Mac Mini M1 (8gb Memory / 500 gb Hard drive) Running Sequoia 15.X.X
I th you can order them in the favourite box, so you can drag what you need there, personally, I just drag my in boxes there.
 
OP
A
Joined
Mar 23, 2013
Messages
201
Reaction score
11
Points
18
Location
near Versailles
Your Mac's Specs
2021iMac M1Ventura;2019 iMac 21.5 Ventura;2017MB 12"Mojave, 2iPhone12, AW2 + AW6
Hi Ann. I don't have a direct answer to your problem, but have two things to mention:

1. The latest version of Sonoma is 17.5 Worth updating I would say.

2. Have you had a read of this:


Not likely that I've helped you but.............

Ian
Hi Ian, Thanks for the reply.

I am a bit puzzled at why you sent me to that link for Outlook for Mac as I already have Microsoft 365 (or Office 365, I can never remember what its most recent name is) with Outlook installed. Maybe because it offers support question/answer and maybe I should switch to New Outlook? I'll try and see if that works.

As for the Sonoma version - that is weird. I got a nudge this morning to upgrade to... Sonoma 14.5 - which I did. I didn't find a reference to 17.5 on Apple's site. Could your suggestion have been a typo?

Ann
 
OP
A
Joined
Mar 23, 2013
Messages
201
Reaction score
11
Points
18
Location
near Versailles
Your Mac's Specs
2021iMac M1Ventura;2019 iMac 21.5 Ventura;2017MB 12"Mojave, 2iPhone12, AW2 + AW6
I th you can order them in the favourite box, so you can drag what you need there, personally, I just drag my in boxes there.
YESSSS ! It worked this time. I tried it yesterday but I tried to move the title (name of the email address) instead of the inbox. Let's hope it works. As simple as that. Thanks for the tip.
 

IWT


Joined
Jan 23, 2009
Messages
10,703
Reaction score
2,602
Points
113
Location
Born Scotland. Worked all over UK. Live in Wales
Your Mac's Specs
M2 Max Studio Extra, 32GB memory, 4TB, Sequoia 15.4.1 Apple 5K Retina Studio Monitor
17.5 on Apple's site

Ann: Entirely my fault:sorrysign (that is for iOS). Sonoma latest is 14.5.

But you seem out of the woods thanks to Jimmysb and others.

Ian
 
OP
A
Joined
Mar 23, 2013
Messages
201
Reaction score
11
Points
18
Location
near Versailles
Your Mac's Specs
2021iMac M1Ventura;2019 iMac 21.5 Ventura;2017MB 12"Mojave, 2iPhone12, AW2 + AW6
Ann: Entirely my fault:sorrysign (that is for iOS). Sonoma latest is 14.5.

But you seem out of the woods thanks to Jimmysb and others.

Ian
Hello Ian, Hello all,

I'm coming back to this issue because although designating accounts as favourites takes them up to the top of the accounts list, it doesn't really resolve my problem which is that I want to move my Gmail account up to the top or just under my default account - and push my two lower-priority accounts to the bottom of the list.

I have seen advice to drag and drop the accounts in order, but suspect that refers to Outlook on PCs.

--> Any more ideas?

Ann
 

IWT


Joined
Jan 23, 2009
Messages
10,703
Reaction score
2,602
Points
113
Location
Born Scotland. Worked all over UK. Live in Wales
Your Mac's Specs
M2 Max Studio Extra, 32GB memory, 4TB, Sequoia 15.4.1 Apple 5K Retina Studio Monitor
I'll try to do better, Ann ;)

See if this works:


Or this suggestion from Microsoft:

Open Outlook and collapse all the accounts so that only the account names are visible. To collapse accounts, select the arrow to the left of the account name.
Click and hold the account you want to move and then drag the account up or down to a different position.
Close and reopen Outlook.

Ian
 
OP
A
Joined
Mar 23, 2013
Messages
201
Reaction score
11
Points
18
Location
near Versailles
Your Mac's Specs
2021iMac M1Ventura;2019 iMac 21.5 Ventura;2017MB 12"Mojave, 2iPhone12, AW2 + AW6
I'll try to do better, Ann ;)

See if this works:


Or this suggestion from Microsoft:

Open Outlook and collapse all the accounts so that only the account names are visible. To collapse accounts, select the arrow to the left of the account name.
Click and hold the account you want to move and then drag the account up or down to a different position.
Close and reopen Outlook.

Ian
Sorry Ian for the late reply, I didn't check for updates...
Anyway, the second option - adding numbers to the account names - indeed worked. I had seen it before but hadn't quite grasped what it was talking about.
The first option - to collapse and then drag the accounts to the desired positions - didn't work in Legacy Outlook, which is what I'm using until I can't any more or until I have time to get used to the New Outlook.
When I tried to drag the account names, nothing happened, ie I couldn't "grasp" the account with the cursor and drag it to a new position.

Ann
 

IWT


Joined
Jan 23, 2009
Messages
10,703
Reaction score
2,602
Points
113
Location
Born Scotland. Worked all over UK. Live in Wales
Your Mac's Specs
M2 Max Studio Extra, 32GB memory, 4TB, Sequoia 15.4.1 Apple 5K Retina Studio Monitor
Anyway, the second option - adding numbers to the account names - indeed worked.

Terrific. Really pleased for you. Are you settled now in respect of your initial post? AOK as they?

Ian
 
Joined
Sep 27, 2008
Messages
69
Reaction score
9
Points
8
Location
SoCal
Your Mac's Specs
MBP 14” M2 Pro, 32GB
Have you tried Outlook > Settings > Accounts? There is an account list on the left side with a "..." drop down at the lower right of the list box, with a "Move Down" option. This allows me to order accounts as desired.

Tom
 

Shell_Bean

New member
Joined
Mar 4, 2025
Messages
1
Reaction score
0
Points
1
Have you tried Outlook > Settings > Accounts? There is an account list on the left side with a "..." drop down at the lower right of the list box, with a "Move Down" option. This allows me to order accounts as desired.

Tom
Tom! You're a genius!!
I went into Setting>Accounts and selected the account I wanted on top and the selected "make default" in the three dots and BAM! Back to the top!

Any advice on preventing outlook 365 from opening all of my accounts when I open the program?

Thanks!
Shell
 

Shop Amazon


Shop for your Apple, Mac, iPhone and other computer products on Amazon.
We are a participant in the Amazon Services LLC Associates Program, an affiliate program designed to provide a means for us to earn fees by linking to Amazon and affiliated sites.
Top